Congestion Management Program (CMP)

Express Highway Performance Data 2012

Abstract: 
This table displays the attributes and performance measures for limited-access roadways in the Boston Region MPO area. This information is displayed visually on the Express-Highway Performance Dashboard.
Data type: 
tabular data

Arterial Highway Performance Data 2012

Abstract: 
This table displays the attributes and performance measures for arterial roadways in the Boston Region MPO area. This information is displayed visually on the Arterial Highway Performance Dashboard.
Data type: 
tabular data

Bicycle Parking Capacity and Utilization, 2009–10 Inventory

Abstract: 
This figure presents the parking capacity and utilization rates for bicycle racks for 2009–10. It is a replication of Appendix A-8 of the memo “Inventory of Park-and-Ride Lots at MBTA Facilities” (2012).
Data type: 
tabular data

Change in Park-and-Ride Utilization Rates from the 2005–06 Inventory to the 2009–10 Inventory

Abstract: 
This map presents percentage of change in park-and-ride utilization rates between 2005–06 and 2009–10. It includes both MBTA-owned lots and private lots that are in close proximity to MBTA stations. This map is a replication of Appendix A-6 of the memo “Inventory of Park-and-Ride Lots at MBTA Facilities” (2012).
Data type: 
tabular data

Minimum Parking Fees at Stations, 2009–10 Inventory

Abstract: 
This map shows the lowest parking fees at each of the MBTA commuter rail stations. It includes both MBTA-owned lots and private lots that are in close proximity to MBTA stations. This map is a replication of Appendix A-7 of the memo “Inventory of Park-and-Ride Lots at MBTA Facilities” (2012).
Data type: 
tabular data

Park-and-Ride Lot Capacity and Utilization, 2009–10 Inventory

Abstract: 
This map presents the park-and-ride capacities and utilization rates for the MBTA station parking lots. It includes both MBTA-owned lots and private lots that are in close proximity to MBTA stations. This map is a replication of Appendix A-5 of the memo “Inventory of Park-and-Ride Lots at MBTA Facilities” (2012).
Data type: 
tabular data

Southeast Expressway Travel Times: Southbound General-Purpose Lanes, PM Peak Period, 2002–11

Abstract: 
This figure displays the average travel times for the southbound general-purpose lanes of the Southeast Expressway (I-93) during the PM peak period. It is a replication of Figure 9 from the memo “Historical Trends: Travel Times and Vehicle Occupancy Levels for I-93 North and Southeast Expressway HOV and General-Purpose Lanes” (2012).
Data type: 
tabular data

Southeast Expressway Travel Times: Southbound HOV Lane, PM Peak Period, 2002–11

Abstract: 
This figure displays the average travel times for the southbound HOV lanes of the Southeast Expressway (I-93) during the PM peak period. It is a replication of Figure 8 from the memo “Historical Trends: Travel Times and Vehicle Occupancy Levels for I-93 North and Southeast Expressway HOV and General-Purpose Lanes” (2012).
Data type: 
tabular data

Southeast Expressway Travel Times: Northbound General-Purpose Lanes, AM Peak Period, 2002–11

Abstract: 
This figure displays the average travel times for the northbound general-purpose lanes of the Southeast Expressway (I-93) during the AM peak period. It is a replication of Figure 7 from the memo “Historical Trends: Travel Times and Vehicle Occupancy Levels for I-93 North and Southeast Expressway HOV and General-Purpose Lanes” (2012).
Data type: 
tabular data

Southeast Expressway Travel Times: Northbound HOV Lane, AM Peak Period, 2002–11

Abstract: 
This figure displays the average travel times for the northbound HOV lane of the Southeast Expressway (I-93) during the AM peak period. It is a replication of Figure 6 from the memo titled “Historical Trends: Travel Times and Vehicle Occupancy Levels for I-93 North and Southeast Expressway HOV and General-Purpose Lanes” (2012).
Data type: 
tabular data

Pages