Regional Transportation Advisory Council

December 13, 2017, Meeting

3:00 PM, State Transportation Building, Conference Room 4, Boston, MA

Meeting Summary

Introductions

Tegin Teich, Chair (Cambridge), called the meeting to order at 3:00 PM. Members and guests attending the meeting introduced themselves. (For attendance list, see page 8.)

Chair’s Report—Tegin Teich

T. Teich announced that a construction team has been selected for the Green Line Extension (GLX) project, with a bid that was less than $1.3 B including six “additive options.” Several components of the original proposal were removed from the construction plan as part of the value-engineering process that was conducted; some of these components were included in the new bid in the form of optional add-ons. The cities of Cambridge and Somerville, the Boston Region Metropolitan Planning Organization (MPO), and Massachusetts Department of Transportation (MassDOT) have all contributed funds for the construction cost of this project. The expected completion date for construction is 2021.

In other news, T. Teich noted that the Draft Environmental Impact Report (DEIR) for the I-90/Allston Interchange project is out for public review with a public meeting scheduled in Cambridge for January 3, 2018. The DEIR includes alternatives for construction design options.

At the last MPO meeting on December 7, 2017, MassDOT presented on the prioritization process for their Bridge Program. MassDOT advised Municipalities contact or visit the MassDOT district offices when seeking clarification on specific bridge ratings.

MaPIT: Project Planning Development Tool—Bryan Pounds and Quinn Molloy, Office of Transportation Planning, MassDOT

Bryan Pounds introduced the Massachusetts Project Intake Tool (MaPIT) and the process with MassDOT of initiating projects involving federal aid funds. MaPIT is the new tool for tracking all new projects and is currently being used by cities and towns that are initiating roadway projects for review by MassDOT’s Project Review Committee (PRC). The new system integrates multiple processes and forms through the project initiation phase. The PRC reviews projects and assigns project numbers for tracking within the system. The new process automates the project development initiation steps and integrates all activities with the geographic information system (GIS) for better tracking, analysis, and reporting purposes.

Quinn Molloy introduced several of the MassDOT web-based geographic mapping and data portals. She noted that the project intake tool was designed to eliminate some of the duplicated processes carried out by the state and the local municipalities. Projects are geocoded onto a GIS data layer and information from associated databases is automatically updated for each project area, retrieving information, for example, from the roadway inventory, safety, and transit data files.  

Q. Molloy is introducing the MaPIT tool to cities, towns, and other interested parties throughout the state. The tool adds all relevant data layers associated with any given project once the project information number is assigned, making all specific project information available in a GIS context. Q. Molloy demonstrated the use of the mapping tools using GeoDOT to show how a project proposal sheet is populated with data drawn from the various data layers that intersect with the hypothetical project. The resulting Project Notification Form (PNF) was generated with data directly from the existing data files prior to submittal. The submitted information is tracked throughout the life of the project.

One of the goals of converting the submittal to this format was to minimize the need for municipalities to hire consultants to complete forms and to decrease barriers to applying for funding for highway (roadway) projects. The duplication of information requested from one form to the other has been eliminated, reducing administrative activity.

Discussion

In response to a member’s question (John McQueen), B. Pounds explained that average daily traffic (ADT) data generated from the statewide travel model projections is considered in planning and scoring projects.

Q. Molloy explained that she works together with cities and towns that employ their own GIS layers. (Robert McGaw) The primacy of the data depends on who owns the roadway. She also noted that data on the maps are often filtered to reflect the project study areas and that continuous data are available for surrounding areas; it is simply not mapped in all cases. Underlying data are coordinated among the various levels of government and administration.

B. Pounds explained that project approval process will also happen through the system.

 

Unified Planning Work Program (UPWP) FFY 2019—Sandy Johnston, UPWP Manager, CTPS

S. Johnston explained that the UPWP is the document that lays out the MPO’s work program for the year with the budget for Federal 3C planning funding. It also includes the contract work that is undertaken by CTPS for other agencies over the course of the federal fiscal year (FFY). FFY 2019 will begin on October 1, 2018.

Each year the MPO approves a reserved amount of money for funding discrete studies. These studies typically focus on a particular issue of interest to the MPO. The general criteria for these studies are that they are regionally relevant, they should not be redundant with work being done elsewhere, they should relate to the nexus of work of the MPO, and they should provide value relating to the goals established by the MPO and noted in the Long-Range Transportation Plan (LRTP). Anyone can submit an idea for the discrete studies, which are compiled into a list of potential studies called the Universe of Proposed New Studies. (See Appendix C – Universe of Proposed New Studies: FFY 2018 UPWP). The potential studies are reviewed by MPO staff, a special committee of the MPO Board, and the Advisory Council, and then are sorted to match the amount of funding available based on the prioritization of the MPO.

S. Johnston stated that the activity from the current meeting is to collect ideas from the Advisory Council for potential studies for next year’s UPWP. As the document develops throughout the spring of 2018, the Advisory Council will officially respond to studies proposed and selected through an official comment letter.

Discussion

In response to a comment from a member, S. Johnston pointed out that the studies undertaken in last year’s UPWP included one called “Transportation Mitigation of Major Developments,” which touches on a capacity-limited transportation system in an area of rapid population growth.

Advisory Council members proposed the following studies, including key points that indicate areas of particular detail and interest:

 

Title

Source

Transportation System Capacity

Robert McGaw (RTAC-Belmont)

 

 

Title

Source

Measuring Economic Benefits of Bike and Pedestrian Improvements

 

Tegin Teich (RTAC-Cambridge, Chair)

 

 

Title

Source

 

Infrastructural Missed Transit Connections

Schuyler Larrabee (RTAC-Boston Society of Architects)

 

 

Title

Source

Bike Share Management

Scott Zadakis (RTAC-CrossTown Connect)

 

 

Title

Source

Closing Paratransit Gaps

Dee Whilleby, Boston Resident

 

 


Title

Source

Planning for Autonomous and Connected Vehicles (AVs/CVs)

 

John McQueen (RTAC-WalkBoston)

 

 

Title

Source

Effects of Bicycle/Pedestrian Infrastructure Implementation

 

John McQueen (RTAC-WalkBoston)

 

 

Title

Source

Commuter Rail Parking and Access

Trevor Laubenstein (RTAC-Westwood)

 

 

Title

Source

Pre-and Post-Evaluation of Freight Infrastructure Modifications

Marilyn Wellons (RTAC-Riverside Neighborhood Association)

 

 

Title

Source

The Future of the Curb

Tegin Teich (RTAC-Cambridge, Chair)

 

 

Title

Source

 

Bus Efficiency

Lenard Diggins (RTAC-Ridership Oversight Committee)

 

 

Title

Source

Intersection Safety

John McQueen (RTAC-WalkBoston)

 

 

Title

Source

 

Blue-Red Connector Modification

Barry Steinberg (RTAC-Association for Public Transportation)

 


 

 

Title

Source

 

Green Line Allston Branch

Barry Steinberg (RTAC-Association for Public Transportation)

 

 

Title

Source

Mobility Around West Station

Robert McGaw (RTAC-Belmont)

 

 

Title

Source

West Station/Allston Transit Study

Tegin Teich (RTAC-Cambridge, Chair)

 

Minutes

A motion to approve the minutes of the October 11, 2017, and November 8, 2017, meetings was made and seconded. The minutes were approved.

Adjournment

A motion to adjourn was made and seconded. The meeting adjourned at 4:40 PM.

 


 

Attendance

 

Municipalities - Voting

Attendee

Belmont

Robert McGaw

Cambridge

Tegin Teich

Marlborough

Walter Bonin

Millis

Ed Chisholm

Westwood

Trevor Laubenstein

Weymouth

Owen MacDonald

Citizen Advocacy Groups - Voting

Attendee

Association for Public Transportation

Barry M Steinberg

Boston Society of Architects

Schuyler Larrabee

Boston Society of Civil Engineers

Paul Moyer

CrosstownConnect

Scott Zadakis

MBTA Ridership Oversight Committee (ROC)

Lenard Diggins

MoveMassachusetts

Jon Seward

National Corridors Initiative

John Businger

Riverside Neighborhood Association

Marilyn Wellons

WalkBoston

John McQueen

Agencies  Non-Voting

Attendee

MassDOT - Agency

Bryan Pounds; Quinn Molloy

US EPA

Eric Rackauskas

Guests

Attendee

Malden Resident

Ed Lowney

Boston Resident

Dee Whittlesey

Staff

Attendee

Lourenço Dantas

David Fargen

Sandy Johnston

Matt Archer

Jen Rowe