TIP ID Proponent(s) Project Name Investment Category MAPC Subregion Programmed Year(s) Design Status FFY 2024 FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 (New) Other Non-Target Funds Adjusted TFPC  (FFYs 2024-28) Adjusted TFPC  (FFYs 2025-29) Cost Increase (%)
S12818 Acton ACTON PARKING MANAGEMENT SYSTEM CC MAGIC 2024 Approved $15,000 $0   $0   $0   $0     $0 $15,000 $15,000 $15,000
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET CS MWRC 2028 25% Comments $0 $742,315 $0 $0 $0 $0 $0 $0 $831,393 $0 $480,000 $1,222,315 $1,316,340 8%
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) BP ICC 2027 25% Received $0 $0 $0 $21,288,202 $0 $0 $21,288,201 $0 $0 $0 $0 $21,288,202 $21,288,202 0%
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET CS ICC 2026 25% Received R1 $0 $8,665,052 $0 $0 $9,011,654 $0 $0 $0 $0 $0 $0 $8,665,052 $9,011,654 4%
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE MI ICC 2027-29 25% Received R1 $0 $0 $0 $0 $0 $8,600,000 $8,600,000 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449 $197,759,449 0%
S12823 Boston BOSTON ELECTRIC BLUEBIKES ADOPTION CC ICC 2024 N/A $1,020,000 $0   $0   $0   $0     $0 $1,020,000 $1,020,000 0%
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA CS ICC 2027 Approved $0 $0 $0 $16,632,000 $0 $0 $17,297,280 $0 $0 $0 $0 $16,632,000 $17,297,280 4%
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET CS ICC 2028 Approved $0 $0 $0 $0 $0 $28,995,267 $0 $0 $30,155,078 $0 $0 $28,995,267 $30,155,078 4%
S12824 Cambridge CAMBRIDGE ELECTRIC BLUEBIKES ADOPTION CC ICC 2024 N/A $315,000 $0   $0   $0         $0 $315,000 $315,000 0%
S12114 Canton ROYALL STREET SHUTTLE CC State Highway Project 2023-24 N/A $148,542 $0   $0   $0         $0 $148,542 $148,542 0%
S12806 Canton CANTON CENTER BICYCLE RACKS CC TRIC 2024 N/A $12,500 $0   $0   $0         $0 $12,500 $12,500 0%
S12805 Canton CANTON PUBLIC SCHOOLS BIKE PROGRAM CC TRIC 2024 N/A $28,125 $0   $0   $0         $0 $28,125 $28,125 0%
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION CC NSTF 2023-25 N/A $0 $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776 $214,776 0%
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION CS ICC 2027 Approved $0 $0 $0 $0 $0 $11,705,708 $11,705,708 $0 $0 $0 $0 $11,705,708 $11,705,708 0%
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET CS ICC 2027 Approved $0 $10,548,928 $0 $0 $0 $0 $11,392,842 $0 $0 $0 $0 $10,548,928 $11,392,842 8%
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD  CS SSC 2026 25% DPH $0 $15,018,900 $0 $0 $33,754,352 $0 $0 $0 $0 $0 $0 $15,018,900 $33,754,352 125%
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS CS NSTF 2027-28 25% Received R1 $0 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $6,197,846 $0 $0 $11,728,698 $12,197,846 4%
609054 Littleton LITTLETON- RECONSTRUCTION OF FOSTER STREET CS MAGIC 2024 PS&E Received - R1 $6,476,821 $0 $0 $0 $0 $0 $0 $0   $0 $0 $6,351,061 $6,476,821 2%
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET CS ICC 2027 Approved $0 $19,698,640 $0 $0 $0 $0 $21,274,531 $0 $0 $0 $0 $19,698,640 $21,274,531 8%
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) CS ICC 2028-29 Approved $0 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $40,980,000 $45,897,600 12%
613088 Malden MALDEN- SPOT POND BROOK GREENWAY BP ICC 2027 Approved $0 $0 $0 $0 $0 $4,858,127 $4,684,622 $0 $0 $0 $0 $4,858,127 $4,684,622 -4%
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE CC MAGIC 2023-25 N/A $430,354 $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995 $836,995 0%
608007 MassDOT COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD CS SSC 2024 100% Complete $15,118,044 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $15,496,957 $15,118,044 -2%
603739 MassDOT WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS MI SWAP 2024 100% Received R1 $18,998,683 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $17,994,890 $18,998,683 6%
110980 MassDOT NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER CS ICC 2024 75% Received $24,182,579 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,851,750 $24,182,579 11%
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET II NSPC 2025 25% Approved $0 $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $1,978,080 $3,438,311 74%
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET CS SWAP 2026 25% Received R2 $0 $0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $9,758,201 $13,548,565 39%
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION MI ICC 2027-29 Approved $0 $0 $0 $0 $0 $35,000,000 $35,000,000 $30,000,000 $30,000,000 $33,840,000 $0 $88,250,000 $88,250,000 0%
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. CS NSPC 2025 75% Comments $0 $23,731,429 $22,818,682 $0 $0 $0 $0 $0 $0 $0 $0 $23,731,429 $22,818,682 -4%
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 II ICC 2027 Approved $0 $0 $0 $0 $0 $5,246,920 $5,059,530 $0 $0 $0 $0 $5,246,920 $5,059,530 -4%
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE II ICC 2026 75% Received $0 $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $6,315,013 $9,807,515 55%
S12705 MBTA LYNN STATION IMPROVEMENTS PHASE II TT ICC 2023-24 N/A $13,600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,600,000 $13,600,000 0%
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS TT ICC 2024-25 N/A $12,250,000 $14,000,000 $14,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $26,250,000 $26,250,000 0%
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING TT NSPC 2024 N/A $14,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000 $14,000,000 0%
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II TT ICC 2024 N/A $11,750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000 $11,750,000 0%
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION CC MWRC 2023-25 N/A $149,425 $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913 $308,913 0%
S12807 MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 CC MWRC 2024-27 N/A $175,000 $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477 $380,477 0%
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION BP MWRC 2028 25% Received $0 $0 $0 $0 $0 $0   $7,760,451 $7,492,849 $0 $0 $7,760,451 $7,492,849 -3%
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION CC ICC 2023-25 N/A $268,246 $209,663 $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $477,909 $477,909 0%
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  II TRIC 2026-27 25% Received R1 $0 $0 $0 $11,125,872 $11,125,872 $17,573,400 $17,573,400 $0 $0 $0 $0 $28,699,272 $28,699,272 0%
609211 Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION BP NSTF 2024 75% Comments $7,231,633 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $7,524,204 $7,231,633 -4%
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 BP NSTF 2025 25% Received R1 $0 $15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $15,777,132 $13,966,099 -11%
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS CS NSTF 2027 75% Received $0 $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $14,172,868 $26,122,722 84%
S12699 Stoneham STONEHAM SHUTTLE SERVICE CC NSPC 2023-25 N/A $261,439 $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628 $466,628 0%
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION BP NSTF 2028 Approved $0 $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,932,000 $8,624,000 -3%
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT CS NSPC 2028 Approved $0 $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $16,581,200 $18,435,976 11%
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION CC ICC 2023-25 N/A $335,434 $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373 $564,373 0%
607777 Watertown WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) CS ICC 2023-24 Advertised $3,494,249 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,494,249 $3,494,249 0%
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  II MWRC 2026 75% Received $0 $0 $0 $2,185,303 $3,362,335 $0 $0 $0 $0 $0 $0 $2,185,303 $3,237,804 48%
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 CS MWRC 2027 25% DPH $0 $0 $0 $16,420,119 $0 $0 $20,740,442 $0 $0 $0 $0 $16,420,119 $19,999,712 22%
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE CS TRIC 2028 25% Received $0 $0 $0 $0 $0 $0 $0 $22,094,875 $22,854,846 $0 $0 $22,094,875 $22,854,846 3%
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE CS NSPC 2027 Approved $0 $0 $0 $17,382,600 $0 $0 $18,077,904 $0 $0 $0 $0 $17,382,600 $17,382,600 0%
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 CS SWAP 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,680,000 $0 $0 $16,680,000 N/A
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION CS NSTF 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $0 $0 $5,368,966 N/A
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST BP MAGIC 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,820,000 $0 $0 $8,820,000 N/A
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE II ICC 2026 75% Received $0 $0 $0 $0 $1,885,352 $0 $0 $0 $0 $0 $0 $0 $1,957,866 N/A
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM TT REGIONWIDE 2026-29 Administrative $0 $2,000,000 $0 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $21,500,000 $28,500,000 N/A
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES TT MWRC 2025 N/A $0 $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000 N/A
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM CC REGIONWIDE 2026-29 Administrative $0 $909,679 $0 $2,337,500 $2,337,500 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $8,334,827 $10,337,500 N/A
TBD Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS CC ICC 2025 N/A $0 $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,878 N/A
TBD Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS CC ICC 2025 N/A $0 $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $0 $379,470 N/A
TBD Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT CC ICC 2025 N/A $0 $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $0 $1,413,375 N/A
TBD Malden MALDEN- CANAL STREET BICYCLE LANES CC ICC 2025 N/A $0 $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,250 N/A
TBD Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  CC ICC 2025 N/A $0 $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $169,000 N/A
TBD Scituate SCITUATE- INSTALLATION OF 30 BICYCLE RACKS CC SSC 2025 N/A $0 $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,800 N/A
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE CC REGIONWIDE 2025-29 Administrative $0 $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $6,000,000 $7,500,000 N/A
TBD Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS CC ICC 2025 N/A $0 $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $0 $590,348 N/A
TBD Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES CC ICC 2025 N/A $0 $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 N/A
TBD Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES CC ICC 2025 N/A $0 $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $0 $385,456 N/A
TBD Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS CC ICC 2025 N/A $0 $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $278,127 N/A
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A REGIONWIDE 2025 Administrative $0 $4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,000,000 $0 N/A
TBD Acton ACTON– GREAT ROAD- HARRIS TO DAVIS INTERSECTIONS AND COMPLETE STREETS PROJECT [DESIGN ONLY] CS MAGIC 2025 Initiated $0 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 N/A
TBD Arlington ARLINGTON- BROADWAY COMPLETE STREETS 25% DESIGN CS ICC 2025 Initiated $0 $0 $575,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $575,000 N/A
TBD Boston BOSTON- RECONSTRUCTION OF BENNINGTON STREET, PORTER STREET TO WOOD ISLAND BUSWAY CS ICC 2025 Initiated $0 $0 $1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,500,000 N/A
TBD Malden MALDEN- ROUTE 60 IMPROVEMENTS [DESIGN ONLY] CS ICC 2025 Initiated $0 $0 $2,600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,600,000 N/A
TBD Malden MALDEN- COMMERCIAL STREET RECONSTRUCTION [DESIGN ONLY] CS ICC 2025 Initiated $0 $0 $935,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $935,000 N/A
612285 Marlborough MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] CS MWRC 2025 Approved $0 $0 $1,215,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,215,000 N/A
TBD Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT [DESIGN ONLY] CS NSTF 2025 Initiated $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 N/A
612962 Southborough SOUTHBOROUGH- RECLAMATION OF MARLBOROUGH ROAD (ROUTE 85) AND FRAMINGHAM ROAD FROM MARLBOROUGH C.L to ROUTE 30 [DESIGN ONLY] CS MWRC 2025 Initiated $0 $0 $1,315,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,315,000 N/A
613641 Burlington BURLINGTON- INTERSECTION IMPROVEMENTS AT ROUTE 3A/CAMBRIDGE STREET AND WINN STREET [DESIGN ONLY] II NSPC 2025 Approved $0 $0 $1,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,700,000 N/A
TBD Holliston HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] II MWRC 2025 Initiated $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 N/A
TBD Sherborn SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] II SWAP 2025 Initiated $0 $0 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000 N/A
613568 Cambridge CAMBRIDGE-NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR [DESIGN ONLY] BP ICC 2025 Approved $0 $0 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,000,000 N/A
TBD Framingham FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] BP MWRC 2025 Initiated $0 $0 $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $850,000 N/A
TBD Hudson HUDSON- MASSACHUSETTS CENTRAL RAIL TRAIL CONSTRUCTION [DESIGN ONLY] BP MAGIC 2025 Initiated $0 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 N/A
613644 Norfolk, Wrentham, Walpole NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] BP SWAP 2025 Initiated $0 $0 $1,550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,550,000 N/A
2024 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2024-29 TIP): $130,647,095 $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                       
Draft Total Programmed Regional Highway Target Funds: $131,087,574 $125,975,489 $55,813,413 $124,667,241 $90,610,293 $144,006,044 $235,817,183 $149,868,526 $184,091,988 $109,840,000 $676,172,876
Regional Highway Target Funds Remaining (Unprogrammed): -$440,479 $2,452,200 $72,614,276 $618,447 $34,675,394 $11,126,099 -$80,685,041 $8,183,649 -$26,039,813 $51,190,608 $51,755,425
Percent Unprogrammed -0.3% 1.9% 56.5% 0.5% 27.7% 7.2% -52.0% 5.2% -16.5% 31.8% 7.1%
Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate an increase in project cost.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year
Indicates a project is proposed to be newly added to the TIP.  These projects do not currently impact the funding balances in the table above.
Abbreviations
TIP investment programs: BP = Bicycle and Pedestrian.  CC = Community Connections.  CS = Complete Streets.  II = Intersection Improvements.  MI = Major Infrastructure.  TT = Transit Transformation
Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee.  MAGIC = Minuteman Advisory Group on Interlocal Coordination.  MWRC = MetroWest Regional Collaborative.  NSPC = North Suburban Planning Council.  NSTF = North Shore Task Force.  SSC = South Shore Coalition.  SWAP = SouthWest Advisory Planning Committee.  TRIC = Three Rivers Interlocal Council.
Other abbreviations: CATA = Cape Ann Transportation Authority.  C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing.  FFY = federal fiscal year.  MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority.  MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority.  MWRTA = MetroWest Regional Transit Authority.  N/A = not applicable.  NewMo = Newton in Motion.  PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates.  R1 = resubmission.  TBD = To Be Determined.  TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.