FFYs 2025–29 TIP Project Scoring

Bicycle Network and Pedestrian Connections Program

Proponent Project Number Project Name MAPC Subregion Project Status Project Cost Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Cambridge 613568 Cambridge-New Bridge and Shared-Use Path Construction over Fitchburg Line at Danehy Park Connector [DESIGN ONLY] ICC PRC Approved (12/19/2023) Design: $3,000,000 78.1 72.5 5.6 14 3.5 14 2.5 15.5 2.5 14 2 15 3.5
Framingham N/A Framingham- Chris Walsh Trail (Phase 2) [DESIGN ONLY] MWRC Preliminary Design Design: $850,000
Construction: $14,300,000
73.9 63.5 10.4 15 8 13.5 6 15 5 8 1 12 6
Hudson N/A Hudson- Massachusetts Central Rail Trail Construction [DESIGN ONLY] MAGIC Preliminary Design Design: $909,700 61.7 56.5 5.2 11.5 3.5 10.5 2 12.5 2 9 2 13 3.5
Norfolk, Wrentham, Walpole 613644 Norfolk-Wrentham-Walpole- Shared-Use Path Installation (Metacomet Greenway) [DESIGN ONLY] SWAP, TRIC Preliminary Design Design: $1,550,000
Construction: $19,754,350
62.6 57.5 5.1 11 3.5 12 2.5 13.5 1.75 8 1.5 13 3.5
Sudbury 613319 Sudbury-Framingham- Bike Path Construction of Bruce Freeman Rail Trail, from the Sudbury Diamond Railroad Crossing to Eaton Road West  MAGIC PRC Approved (6/01/2023) $8,820,000 TBD 31 TBD 12 TBD 8.5 TBD 10.5 TBD TBD TBD TBD TBD
            100 80 20 16   15   17   16   16  

 

Complete Streets Program

Proponent Project Number Project Name MAPC Subregion Project Status Project Cost Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Acton N/A Acton- Great Road, from Harris Street to Davis Road Intersections, Complete Streets Project [DESIGN ONLY] MAGIC Preliminary Design Design: $860,000
Construction: $8,600,000
45.4 41 4.4 10 4 14 3 8 1.5 1 0 8 2.5
Arlington N/A Arlington- Broadway Complete Streets 25% Design ICC Preliminary Design Design: $575,000 74.5 67.5 7 16 4 16 5 9.5 2.5 12 2 14 4
Boston N/A Boston- Reconstruction of Bennington Street, Porter Street to Wood Island Busway [DESIGN ONLY] ICC Preliminary Design Design: $1,500,000
Construction: $15,000,000
76.2 66 10.2 9.5 4.5 17.5 6.75 11 3.75 14 3 14 7.5
Bellingham 612963 Bellingham- Roadway Rehabilitation of Route 126 (Hartford Road) from 800 Feet North of the Interstate 495 Northbound Off-Ramp to Medway Town Line, including B-06-017.   SWAP PRC Approved (9/15/2022) $13,900,000 54.3 50 4.3 7.5 2 12.5 3.25 14 2.5 7 0.5 9 2.5
Malden N/A Malden- Route 60 Improvement Project  [DESIGN ONLY] ICC Preliminary Design Design: $2,600,000
Cosntruction: $21,201,687
71.15 62 9.15 14.5 6 17 6.375 12.5 3.75 10 3 8 3.75
Malden N/A Malden- Commercial Street Reconstruction [DESIGN ONLY] ICC Preliminary Design Design: $935,000
Construction: $7,250,000
62.25 54 8.25 13 5.25 15 5.625 10 2.25 5 3 11 4.5
Marlborough 612285 Marlborough- Reconstruction of Granger Boulevard [DESIGN ONLY] MWRC PRC Approved
(6/24/2021)
Design: $1,215,000
Construction: $12,145,000
61.9 55 6.9 9 3 15 5.25 13 3.75 9 2.25 9 3
Ipswich 612738 Ipswich- Argilla Road Ecological Tidal Restoration Project NSTF PRC Approved (5/12/2022) $13,200,000 37.9 35.5 2.4 2.5 0.5 7 0.5 7 1.5 11 1 8 2.5
Salem N/A Salem- Broad Street and Dalton Parkway Corridor Project [DESIGN ONLY] NSTF Preliminary Design Design: $250,000
Construction: $2,500,000
52.2 47 5.2 11.5 3 13 4 10.5 2.5 2 0.5 10 3
Southborough 612962 Southborough- Reclamation of Marlborough Road (Route 85) and Framingham Road from Marlborough City Line to Route 30 [DESIGN ONLY] MWRC Preliminary Design Design: $1,315,000
Construction: $13,153,146
52.5 52.5 4.7 8 2 11 3.5 8.5 0.75 11 2 14 3.5
            100 80 20 16   19   15   14   16  

 

Intersection Improvements Program

Proponent Project Number Project Name MAPC Subregion Project Status Project Cost Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Burlington 613641 Burlington- Intersection Improvements at Route 3A/Cambridge Street and Winn Street [DESIGN ONLY] NSPC PRC Approved (12/19/2023) Design: $1,700,000
Construction: $9,557,295
62.6 57.5 5.1 21.5 4.5 16.5 4.25 12.5 2.5 3 0.5 4 1
Holliston N/A Holliston- Intersection Improvements at Route 16 and Whitney Street [DESIGN ONLY] MWRC Preliminary Design Design: $250,000
Construction: $2,500,000
42.8 39.5 3.3 19 5 9 1.5 5.5 0.75 4 1 2 0
Sherborn N/A Sherborn- Reconstruction of Route 27 and Route 16 [DESIGN ONLY] SWAP Preliminary Design Design: $900,000
Construction: $9,000,000
67.6 62 5.6 22 5 14 3 15 2.5 5 1.5 6 2
Quincy 610823 Quincy- Intersection Improvements at Willard Street and Ricciuti Drive ICC 75% Design $1,812,839 41.1 36 5.1 16.5 6 11 5.25 4.5 0.75 -1 -2.25 5 3
            100 80 20 25   18   14   12   11  

 

Transit Transformation Program

Proponent Project Number Project Name MAPC Subregion Project Status Project Cost Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
CATA N/A CATA- Fare Upgrades for ADA and Dial-A-Ride Customers NSTF N/A $65,000 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
CATA N/A CATA- CATA Gloucester Facility Modernization NSTF N/A $1,293,000 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
CATA N/A CATA - Vehicle Replacement (4 Vehicles) NSTF N/A $2,460,000 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
MWRTA N/A MWRTA- Procurement of Three 29 Foot Buses MWRC N/A $1,980,000 52.2 47 5.2 9 2 14 4 12 4 6 0.5 6 2.5
MWRTA N/A MWRTA- Blandin Hub Equitable Redesign Initiative MWRC N/A $2,500,000 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
            100 79 21 16   16   16   16   15  

 

Community Connections Program

Proponent Project Name MAPC Subregion Project Cost Cost/Point Total Score Connectivity Regional and Interlocal Coordination Plan Implementation Transportation Equity Climate Change Mitigation Performance Management
Arlington Arlington- Installation of 123 Bicycle Racks and Related Materials ICC $90,878 $1,346 67.5 15 7 16 9.5 13 7
Boston Boston- Bluebikes State-of-Good Repair, Twelve Stations ICC $590,348 $7,717 76.5 18 8 14 12.5 14 10
Boston Boston- Installation of 1,600 Bicycle Racks ICC $379,470 $4,628 82 18 8 18 11 17 10
Brookline Brookline- Bluebikes State-of-Good Repair, Three Stations and 62 Pedal Bicycles ICC $200,000 $3,390 59 16 8 6 7 13 9
Cambridge Cambridge- Bluebikes State-of-Good Repair, Eight Stations and 65 Pedal Bicycles  ICC $385,456 $5,627 68.5 17 8 12 8.5 14 9
Chelsea, Revere Chelsea-Revere- Regional On-Demand Microtransit Pilot Project ICC $499,649 $9,296 53.75 13 11 N/A 11.25 11.5 7
Malden Malden- Canal Street Bicycle Lanes ICC $81,250 $1,585 51.25 9 7 12 8.25 8 7
Revere Revere- Bluebikes Expansion, Four Stations and 40 Pedal Bicycles ICC $169,000 $2,661 63.5 17 6 10 7.5 14 9
Scituate Scituate- Installation of 25 Bicycle Racks SSC $22,800 $501 45.5 9 8 16 4.5 2 6
Somerville Somerville- Bluebikes State-of-Good Repair, Thirteen Stations ICC $278,127 $4,120 67.5 14 8 16 7.5 13 9
                         

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. PRC = MassDOT's Project Review Committee. TBD = to be determined.

Metropolitan Area Planning Council (MAPC) Subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.