FFYs 2025-29 Preliminary Scenario

 

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFYs 2024–28 Programmed Year(s) FFYs 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2024-28)
Adjusted TFPC
 (FFYs 2025-29)
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,222,315 $1,316,339
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $0 $0 $21,288,202 $0 $0 $0 $0 $21,288,202 $21,288,202
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052 $8,665,052
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449 $197,759,449
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $16,632,000 $16,632,000
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267 $28,995,267
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776 $214,776
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708 $11,287,647
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,548,928 $10,954,656
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $15,018,900 $28,738,432
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698 $11,728,698
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640 $19,698,640
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $40,980,000 $45,897,600
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995 $406,641
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $1,978,080 $3,438,311
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $9,758,201 $13,548,565
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000 $88,250,000
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,978,347 $0 $0 $0 $0 $0 $0 $0 $0 $23,731,429 $37,978,347
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,246,920 $5,246,920
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $6,315,013 $9,807,515
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $26,250,000 $33,500,000
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000 $16,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000 $31,050,000
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477 $380,477
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,760,451 $7,492,849
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909 $477,909
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $28,699,272 $27,636,336
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $15,777,132 $13,966,099
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $14,172,868 $26,122,722
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628 $466,628
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,932,000 $8,624,000
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $16,581,200 $18,435,976
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373 $564,373
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $2,185,303 $3,237,804
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $16,420,119 $19,999,712
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,094,875 $22,854,847
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600 $17,382,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $0 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $6,600,000 $0 $0 $5,368,966
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 50.5 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000 $0 $0 $8,526,000
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $0 $1,885,353
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $1,400,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $21,500,000 $24,500,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000   $0   $0   $0 $0 $0 $1,293,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $0 $2,460,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,334,827 $8,423,415
TBD Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
TBD Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
TBD Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $0 $1,413,735
TBD Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
TBD Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
TBD Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $6,000,000 $7,500,000
TBD Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
TBD Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 59 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
TBD Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
TBD Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,000,000 $0
TBD Acton ACTON– GREAT ROAD- HARRIS TO DAVIS INTERSECTIONS AND COMPLETE STREETS PROJECT [DESIGN ONLY] 45.4 CS MAGIC N/A 2025 Initiated $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $860,000
TBD Arlington ARLINGTON- BROADWAY COMPLETE STREETS 25% DESIGN 80.1 CS ICC N/A 2025 Initiated $0 $1,395,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,395,000
TBD Boston BOSTON- RECONSTRUCTION OF BENNINGTON STREET, PORTER STREET TO WOOD ISLAND BUSWAY 76.2 CS ICC N/A 2025 Initiated $0 $1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,500,000
TBD Malden MALDEN- ROUTE 60 IMPROVEMENTS [DESIGN ONLY] 71.15 CS ICC N/A 2025 Initiated $0 $2,600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,600,000
TBD Malden MALDEN- COMMERCIAL STREET RECONSTRUCTION [DESIGN ONLY] 62.25 CS ICC N/A 2025 Initiated $0 $935,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $935,000
TBD Marlborough MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] 79.9 CS MWRC N/A 2025 Approved $0 $1,215,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,215,000
TBD Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT [DESIGN ONLY] 60.1 CS NSTF N/A 2025 Initiated $0 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000
TBD Southborough SOUTHBOROUGH- RECLAMATION OF MARLBOROUGH ROAD (ROUTE 85) AND FRAMINGHAM ROAD FROM MARLBOROUGH C.L to ROUTE 30 [DESIGN ONLY] 52.5 CS MWRC N/A 2025 Initiated $0 $1,315,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,315,000
613641 Burlington BURLINGTON- INTERSECTION IMPROVEMENTS AT ROUTE 3A/CAMBRIDGE STREET AND WINN STREET [DESIGN ONLY] 71 II NSPC N/A 2025 Approved $0 $1,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,700,000
TBD Holliston HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] 42.8 II MWRC N/A 2025 Initiated $0 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000
TBD Sherborn SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] 81.8 II SWAP N/A 2025 Initiated $0 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000
613568 Cambridge CAMBRIDGE-NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR [DESIGN ONLY] 78.1 BP ICC N/A 2025 Approved $0 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,000,000
TBD Framingham FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] 79.9 BP MWRC N/A 2025 Initiated $0 $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $850,000
TBD Hudson HUDSON- MASSACHUSETTS CENTRAL RAIL TRAIL CONSTRUCTION [DESIGN ONLY] 62.7 BP MAGIC N/A 2025 Initiated $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $909,700
TBD Norfolk, Wrentham, Walpole NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] 65 BP SWAP N/A 2025 Initiated $0 $1,550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,550,000

 

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2024-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $116,238,093 $124,667,241 $116,569,057 $144,006,044 $180,366,179 $149,868,526 $157,830,836 $158,771,267 $729,775,433
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $12,189,596 $618,447 $8,716,630 $11,126,099 -$25,234,037 $8,183,649 $221,339 $2,259,341 -$1,847,132
Percent Unprogrammed 1.9% 9.5% 0.5% 7.0% 7.2% -16.3% 5.2% 0.1% 1.4% -0.3%

 

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year
Indicates a project is proposed to be newly added to the TIP
Indicates a project proposed for additional changes beyond those made at the February 2024 TIP readiness meeting.

 

Abbreviations

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation.

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations: CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

 

Metrics for Project Prioritization

 

Project ID Project Name Phase Investment Program Score Cost Length (Miles) Cost/Mile AADT/Daily Trips Cost/Daily Trip CO2 Reduction (KG/year) Value of Annual CO2 Reduction Latest Regional TIP Project (Non CC)
613568 Cambridge-New Bridge and Shared-Use Path Construction over Fitchburg Line at Danehy Park Connector [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 78.1 $3,000,000 0.35 $8,571,429     N/A   2020
N/A Framingham- Chris Walsh Trail (Phase 2) [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 79.9 $850,000 0.54 $1,574,074     N/A   2023
N/A Hudson- Massachusetts Central Rail Trail Construction [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 62.7 $909,700 2.98 $305,268     N/A   2011
613644 Norfolk-Wrentham-Walpole- Shared-Use Path Installation (Metacomet Greenway) [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 65 $1,550,000 3.15 $492,063     N/A   Norfolk: 2009
Walpole: 2020
Wrentham: 2024
613319 Sudbury-Framingham- Bike Path Construction of Bruce Freeman Rail Trail, from the Sudbury Diamond Railroad Crossing to Eaton Road West  Construct Bicycle Network and Pedestrian Connections TBD $8,820,000 1.3 $6,784,615     18,347.58 $480.72 2022
N/A Acton- Great Road, from Harris Street to Davis Road Intersections, Complete Streets Project [Design Only] Design Complete Streets 45.4 $860,000 1.17 $735,043 14771 $58.22 N/A   2022
N/A Arlington- Broadway Complete Streets 25% Design Design Complete Streets 80.1 $1,395,000 1.07 $1,303,738 12105 $115.24 N/A   2014
N/A Boston- Reconstruction of Bennington Street, Porter Street to Wood Island Busway Design Complete Streets 76.2 $1,500,000 1.8 $833,333 11271 $133.08 N/A   2029
612963 Bellingham- Roadway Rehabilitation of Route 126 (Hartford Road) from 800 Feet North of the Interstate 495 Northbound Off-Ramp to Medway Town Line, including B-06-017  Construct Complete Streets 54.3 $13,900,000 1.53 $9,084,967 16691 $832.78 2557.9992 $5,433.93 2022
N/A Malden- Route 60 Improvement Project  [DESIGN ONLY] Design Complete Streets 71.15 $2,600,000 2.64 $984,848 17569 $147.99 N/A   2027
N/A Malden- Commercial Street Reconstruction [DESIGN ONLY] Design Complete Streets 62.25 $935,000 0.89 $1,050,562 18864 $49.57 N/A   2027
612285 Marlborough- Reconstruction of Granger Boulevard [DESIGN ONLY] Design Complete Streets 79.9 $1,215,000 0.51 $2,382,353 13001 $93.45 N/A   2017
612738 Ipswich- Argilla Road Reconstruction Construct Complete Streets 37.9 $13,200,000 0.24 $55,000,000 1955 $6,751.92 306.335 $43,090.08 2027
N/A Salem- Broad Street and Dalton Parkway Corridor Project [DESIGN ONLY] Design Complete Streets 60.1 $250,000 0.56 $446,429 6880 $36.34 N/A   2027
612962 Southborough- Reclamation of Marlborough Road (Route 85) and Framingham Road from Marlborough C.L to Route 30 Design Complete Streets 52.5 $1,315,000 1.97 $667,513 8507 $154.58 N/A   2018
613641 Burlington- Intersection Improvements at Route 3A/Cambridge Street and Winn Street  Design Intersection Improvements 62.6 $1,700,000 0.85 $2,000,000 29741 $57.16 N/A   2017
N/A Holliston- Intersection Improvements at Route 16 and Whitney Street Design Intersection Improvements 42.8 $250,000 0.19 $1,315,789 14855 $16.83 N/A   <2008
N/A Sherborn- Reconstruction of Route 27 and Route 16 Design Intersection Improvements 81.8 $900,000 1.74 $517,241 22689 $39.67 N/A   <2008
610823 Quincy- Intersection Improvements at Willard Street and Ricciuti Drive Construct Intersection Improvements 41.1 $1,812,839 0.35 $5,179,540 9415 $192.55 288,400.99 $6.29 2023
N/A CATA- Fare Upgrades for ADA and Dial-A-Ride Customers Construct Transit Transformation TBD $65,000 N/A N/A         <2008
N/A CATA- CATA Gloucester Facility Modernization Construct Transit Transformation TBD $1,293,000 N/A N/A         <2008
N/A CATA - Vehicle Replacement (4 Vehicles) Construct Transit Transformation TBD $2,460,000 N/A N/A         <2008
N/A MWRTA- Procurement of Three 29 Foot Buses Construct Transit Transformation 52.2 $1,980,000 N/A N/A         <2008
N/A MWRTA- Blandin Hub Equitable Redesign Initiative Design Transit Transformation TBD $2,500,000 N/A N/A         <2008
N/A Arlington- Installation of 123 Bicycle Racks and Related Materials Construct Community Connections 74.5 $90,878 N/A N/A     N/A (qualitative)   2014
N/A Boston- Bluebikes State-of-Good Repair, Twelve Stations Construct Community Connections 76.5 $590,348 N/A N/A         2029
N/A Boston- Installation of 1600 Bicycle Racks Construct Community Connections 82 $379,470 N/A N/A     N/A (qualitative)   2029
N/A Brookline- Bluebikes State-of-Good Repair, Three Stations and 62 Pedal Bicycles Construct Community Connections 59 $200,000 N/A N/A         2028
N/A Cambridge- Bluebikes State-of-Good Repair, Eight Stations and 65 Pedal Bicycles  Construct Community Connections 68.5 $385,456 N/A N/A         2020
N/A Chelsea-Revere- Regional On-Demand Microtransit Pilot Project Construct Community Connections 53.75 $499,649 N/A N/A 58 $36     Chelsea: 2027
Revere: <2008
N/A Malden- Canal Street Bicycle Lanes Construct Community Connections 51.25 $81,250 0.51 $159,314     33311.76 $2.44 2027
N/A Revere- Bluebikes Expansion, Four Stations and 40 Pedal Bicycles Construct Community Connections 63.5 $169,000 N/A N/A     1517.8909 $111.34 <2008
N/A Scituate- Installation of 25 Bicycle Racks Construct Community Connections 45.5 $22,800 N/A N/A     N/A (qualitative)   2029
N/A Somerville- Bluebikes State-of-Good Repair, Thirteen Stations Construct Community Connections 67.5 $278,127 N/A N/A         2029

 

Abbreviations

AADT = Average Annual Daily Traffic. ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority. CC = Community Connections Program. C.L. = city line. FFY = federal fiscal year. CO2 = carbon dioxide. KG = kilograms. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. TBD = to be determined. TIP = Transportation Improvement Program.