Project ID Project Name Phase Investment Program Score Cost Length (Road Miles) Cost/Mile AADT/Daily Trips Cost/Daily Trip CO2 Reduction (KG)/yr $ / Annual CO2 (KG) Red. Latest Regional TIP Project (Non CC)
613319 Sudbury-Framingham- Bike Path Construction of Bruce Freeman Rail Trail, from the Sudbury Diamond Railroad Crossing to Eaton Road West  Construct Bicycle Network and Pedestrian Connections 50.5 $8,820,000 1.3 $6,784,615 18,347.58 $480.72 2022
N/A Arlington- Installation of 123 Bicycle Racks and Related Materials Construct Community Connections 74.5 $90,878 N/A N/A N/A Not Applicable - Qualitative CO2 Reduction 2014
N/A Boston- Bluebikes State-of-Good Repair, Twelve Stations Construct Community Connections 76.5 $590,348 N/A N/A N/A Not Applicable - Qualitative CO2 Reduction 2029
N/A Boston- Installation of 1600 Bicycle Racks Construct Community Connections 82 $379,470 N/A N/A N/A Not Applicable - Qualitative CO2 Reduction 2029
N/A Brookline- Bluebikes State-of-Good Repair, Three Stations and 62 Pedal Bicycles Construct Community Connections 67 $200,000 N/A N/A 4277.69 $46.75 2028
N/A Cambridge- Bluebikes State-of-Good Repair, Eight Stations and 65 Pedal Bicycles  Construct Community Connections 68.5 $385,456 N/A N/A 4484.68 $85.95 2020
N/A Chelsea-Revere- Regional On-Demand Microtransit Pilot Project Construct Community Connections 53.75 $499,649 N/A N/A 58 $36 4054.53 $123.23 Chelsea: 2027
Revere: <2008
N/A Malden- Canal Street Bicycle Lanes Construct Community Connections 51.25 $81,250 0.51 $159,314 33311.76 $2.44 2027
N/A Revere- Bluebikes Expansion, Four Stations and 40 Pedal Bicycles Construct Community Connections 63.5 $169,000 N/A N/A 1517.8909 $111.34 <2008
N/A Scituate- Installation of 25 Bicycle Racks Construct Community Connections 45.5 $22,800 N/A N/A N/A Not Applicable - Qualitative CO2 Reduction 2029
N/A Somerville- Bluebikes State-of-Good Repair, Thirteen Stations Construct Community Connections 67.5 $278,127 N/A N/A N/A Not Applicable - Qualitative CO2 Reduction 2029
612963 Bellingham- Roadway Rehabilitation of Route 126 (Hartford Road) from 800 Feet North of the Interstate 495 Northbound Off-Ramp to Medway Town Line, including B-06-017.   Construct Complete Streets 54.3 $13,900,000 1.53 $9,084,967 16691 $832.78 2557.9992 $5,433.93 2022
612738 Ipswich- Argilla Road Reconstruction Construct Complete Streets 37.9 $13,200,000 0.24 $55,000,000 1955 $6,751.92 306.335 $43,090.08 2027
610823 Quincy- Intersection Improvements at Willard Street and Ricciuti Drive Construct Intersection Improvements 41.1 $1,812,839 0.35 $5,179,540 9415 $192.55 288,400.99 $6.29 2023
N/A CATA- Fare Upgrades for ADA and Dial-A-Ride Customers Construct Transit Transformation TBD $65,000 N/A N/A N/A <2008
N/A CATA- CATA Gloucester Facility Modernization Construct Transit Transformation TBD $1,293,000 N/A N/A N/A <2008
N/A CATA - Vehicle Replacement (4 Vehicles) Construct Transit Transformation TBD $2,460,000 N/A N/A TBD <2008
N/A MWRTA- Procurement of Three 29 Foot Buses Construct Transit Transformation 52.2 $1,980,000 N/A N/A N/A <2008
613568 Cambridge-New Bridge and Shared-Use Path Construction over Fitchburg Line at Danehy Park Connector [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 78.1 $3,000,000 0.35 $8,571,429 N/A 2020
N/A Framingham- Chris Walsh Trail (Phase 2) [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 79.9 $850,000 0.54 $1,574,074 N/A 2023
N/A Hudson- Massachusetts Central Rail Trail Construction [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 62.7 $909,700 2.98 $305,268 N/A 2011
613644 Norfolk-Wrentham-Walpole- Shared-Use Path Installation (Metacomet Greenway) [DESIGN ONLY] Design Bicycle Network and Pedestrian Connections 65 $1,550,000 3.15 $492,063 N/A Norfolk: 2009
Walpole: 2020
Wrentham: 2024
N/A Acton- Great Road, from Harris Street to Davis Road Intersections, Complete Streets Project [Design Only] Design Complete Streets 45.4 $860,000 1.17 $735,043 14771 $58.22 N/A 2022
N/A Arlington- Broadway Complete Streets 25% Design Design Complete Streets 80.1 $1,395,000 1.07 $1,303,738 12105 $115.24 N/A 2014
N/A Boston- Reconstruction of Bennington Street, Porter Street to Wood Island Busway Design Complete Streets 76.2 $1,500,000 1.8 $833,333 11271 $133.08 N/A 2029
N/A Malden- Route 60 Improvement Project  [DESIGN ONLY] Design Complete Streets 71.15 $2,600,000 2.64 $984,848 17569 $147.99 N/A 2027
N/A Malden- Commercial Street Reconstruction [DESIGN ONLY] Design Complete Streets 62.25 $935,000 0.89 $1,050,562 18864 $49.57 N/A 2027
612285 Marlborough- Reconstruction of Granger Boulevard [DESIGN ONLY] Design Complete Streets 79.9 $1,215,000 0.51 $2,382,353 13001 $93.45 N/A 2017
N/A Salem- Broad Street and Dalton Parkway Corridor Project [DESIGN ONLY] Design Complete Streets 60.1 $1,068,780 0.56 $1,908,536 6880 $155.35 N/A 2027
612962 Southborough- Reclamation of Marlborough Road (Route 85) and Framingham Road from Marlborough C.L to Route 30 Design Complete Streets 52.5 $1,315,000 1.97 $667,513 8507 $154.58 N/A 2018
613641 Burlington- Intersection Improvements at Route 3A/Cambridge Street and Winn Street  Design Intersection Improvements 71 $1,700,000 0.85 $2,000,000 29741 $57.16 N/A 2017
N/A Holliston- Intersection Improvements at Route 16 and Whitney Street Design Intersection Improvements 42.8 $250,000 0.19 $1,315,789 14855 $16.83 N/A <2008
N/A Sherborn- Reconstruction of Route 27 and Route 16 Design Intersection Improvements 81.8 $900,000 1.74 $517,241 22689 $39.67 N/A <2008
N/A MWRTA- Blandin Hub Equitable Redesign Initiative Design Transit Transformation TBD $2,500,000 N/A N/A N/A <2008

 

Abbreviations

CATA = Cape Ann Transportation Authority. CC = Community Connections. KG = kilograms. MWRTA = MetroWest Regional Transit Authority. TBD = To be determined.

 

Disclaimer: These metrics are draft measures compiled by MPO Staff to assist in project evaluation. The figures presented here are not final, as some projects are at early stages of development and their metrics are to be determined. For design projects, project limits and scopes of work may be subject to change as design progresses. Municipalities listed as "<2008" for their prior TIP projects have not had a TIP project since before 2008, which is the earliest year of analysis that MPO staff utilize for Geographic Distributions of TIP Funding for regional prioritization. For more information on geographic distributions of TIP funding, please refer to Appendix D of the TIP.