Proponent | Project Number | Project Name | MAPC Subregion | Project Status | Project Cost | Total Score | Total Base Score | Total Scaled Equity Score | Safety | Safety Equity Score | Mobility and Reliability | Mobility and Reliability Equity Score | Access and Connectivity | Access and Connectivity Equity Score | Resilience | Resilience Equity Score | Clean Air and Healthy Communities | Clean Air and Healthy Communities Equity Score |
Cambridge | 613568 | Cambridge-New Bridge and Shared-Use Path Construction over Fitchburg Line at Danehy Park Connector [DESIGN ONLY] | ICC | PRC Approved (12/19/2023) | Design: $3,000,000 | 78.1 | 72.5 | 5.6 | 14 | 3.5 | 14 | 2.5 | 15.5 | 2.5 | 14 | 2 | 15 | 3.5 |
Framingham | N/A | Framingham- Chris Walsh Trail (Phase 2) [DESIGN ONLY] | MWRC | Preliminary Design | Design: $850,000 Construction: $14,300,000 |
79.9 | 69.5 | 10.4 | 15 | 8 | 13.5 | 6 | 15 | 5 | 13 | 1 | 13 | 6 |
Hudson | N/A | Hudson- Massachusetts Central Rail Trail Construction [DESIGN ONLY] | MAGIC | Preliminary Design | Design: $909,700 | 62.7 | 57.5 | 5.2 | 11.5 | 3.5 | 10.5 | 2 | 12.5 | 2 | 10 | 2 | 13 | 3.5 |
Norfolk, Wrentham, Walpole | 613644 | Norfolk-Wrentham-Walpole- Shared-Use Path Installation (Metacomet Greenway) [DESIGN ONLY] | SWAP, TRIC | Preliminary Design | Design: $1,550,000 Construction: $19,754,350 |
65 | 59.5 | 5.5 | 11 | 3.5 | 12 | 2.5 | 13.5 | 1.75 | 10 | 2 | 13 | 4 |
Sudbury | 613319 | Sudbury-Framingham- Bike Path Construction of Bruce Freeman Rail Trail, from the Sudbury Diamond Railroad Crossing to Eaton Road West | MAGIC | PRC Approved (6/01/2023) | $8,820,000 | 50.5 | 47 | 3.5 | 12 | 3.5 | 8.5 | 1.75 | 10.5 | 0.5 | 7 | 1 | 9 | 2 |
100 | 80 | 20 | 16 | 15 | 17 | 16 | 16 |
Proponent | Project Number | Project Name | MAPC Subregion | Project Status | Project Cost | Total Score | Total Base Score | Total Scaled Equity Score | Safety | Safety Equity Score | Mobility and Reliability | Mobility and Reliability Equity Score | Access and Connectivity | Access and Connectivity Equity Score | Resilience | Resilience Equity Score | Clean Air and Healthy Communities | Clean Air and Healthy Communities Equity Score |
Acton | N/A | Acton- Great Road, from Harris Street to Davis Road Intersections, Complete Streets Project [DESIGN ONLY] | MAGIC | Preliminary Design | Design: $860,000 Construction: $8,600,000 |
45.4 | 41 | 4.4 | 10 | 4 | 14 | 3 | 8 | 1.5 | 1 | 0 | 8 | 2.5 |
Arlington | N/A | Arlington- Broadway Complete Streets [DESIGN ONLY] | ICC | Preliminary Design | Design: $1,395,000 | 80.1 | 72.5 | 7.6 | 16 | 4 | 16 | 5 | 10.5 | 2.5 | 13 | 2 | 17 | 5.5 |
Boston | N/A | Boston- Reconstruction of Bennington Street, Porter Street to Wood Island Busway [DESIGN ONLY] | ICC | Preliminary Design | Design: $1,500,000 Construction: $15,000,000 |
76.2 | 66 | 10.2 | 9.5 | 4.5 | 17.5 | 6.75 | 11 | 3.75 | 14 | 3 | 14 | 7.5 |
Bellingham | 612963 | Bellingham- Roadway Rehabilitation of Route 126 (Hartford Road) from 800 Feet North of the Interstate 495 Northbound Off-Ramp to Medway Town Line, including B-06-017. | SWAP | PRC Approved (9/15/2022) | $13,900,000 | 54.3 | 50 | 4.3 | 7.5 | 2 | 12.5 | 3.25 | 14 | 2.5 | 7 | 0.5 | 9 | 2.5 |
Malden | N/A | Malden- Route 60 Improvement Project [DESIGN ONLY] | ICC | Preliminary Design | Design: $2,600,000 Cosntruction: $21,201,687 |
71.15 | 62 | 9.15 | 14.5 | 6 | 17 | 6.375 | 12.5 | 3.75 | 10 | 3 | 8 | 3.75 |
Malden | N/A | Malden- Commercial Street Reconstruction [DESIGN ONLY] | ICC | Preliminary Design | Design: $935,000 Construction: $7,250,000 |
62.25 | 54 | 8.25 | 13 | 5.25 | 15 | 5.625 | 10 | 2.25 | 5 | 3 | 11 | 4.5 |
Marlborough | 612285 | Marlborough- Reconstruction of Granger Boulevard [DESIGN ONLY] | MWRC | PRC Approved (6/24/2021) |
Design: $1,215,000 Construction: $12,145,000 |
79.9 | 70 | 9.9 | 14 | 6 | 17 | 6.75 | 13 | 3.75 | 13 | 3 | 13 | 5.25 |
Ipswich | 612738 | Ipswich- Argilla Road Ecological Tidal Restoration Project | NSTF | PRC Approved (5/12/2022) | $6,600,000 | 37.9 | 35.5 | 2.4 | 2.5 | 0.5 | 7 | 0.5 | 7 | 1.5 | 11 | 1 | 8 | 2.5 |
Salem | N/A | Salem- Broad Street and Dalton Parkway Corridor Project [DESIGN ONLY] | NSTF | Preliminary Design | Design: $1,068,780 Construction: $2,500,000 |
60.1 | 54.5 | 5.6 | 13.5 | 4 | 16 | 4 | 12 | 2.5 | 3 | 0.5 | 10 | 3 |
Southborough | 612962 | Southborough- Reclamation of Marlborough Road (Route 85) and Framingham Road from Marlborough C.L to Route 30 [DESIGN ONLY] | MWRC | Preliminary Design | Design: $1,315,000 Construction: $13,153,146 |
52.5 | 52.5 | 4.7 | 8 | 2 | 11 | 3.5 | 8.5 | 0.75 | 11 | 2 | 14 | 3.5 |
100 | 80 | 20 | 16 | 19 | 15 | 14 | 16 |
Proponent | Project Number | Project Name | MAPC Subregion | Project Status | Project Cost | Total Score | Total Base Score | Total Scaled Equity Score | Safety | Safety Equity Score | Mobility and Reliability | Mobility and Reliability Equity Score | Access and Connectivity | Access and Connectivity Equity Score | Resilience | Resilience Equity Score | Clean Air and Healthy Communities | Clean Air and Healthy Communities Equity Score |
Burlington | 613641 | Burlington- Intersection Improvements at Route 3A/Cambridge Street and Winn Street [DESIGN ONLY] | NSPC | PRC Approved (12/19/2023) | Design: $1,700,000 Construction: $9,557,295 |
71 | 64.5 | 6.5 | 21.5 | 4.5 | 16.5 | 4.25 | 12.5 | 2.5 | 5 | 1.5 | 9 | 3.5 |
Holliston | N/A | Holliston- Intersection Improvements at Route 16 and Whitney Street [DESIGN ONLY] | MWRC | Preliminary Design | Design: $250,000 Construction: $2,500,000 |
42.8 | 39.5 | 3.3 | 19 | 5 | 9 | 1.5 | 5.5 | 0.75 | 4 | 1 | 2 | 0 |
Sherborn | N/A | Sherborn- Reconstruction of Route 27 and Route 16 [DESIGN ONLY] | SWAP | Preliminary Design | Design: $900,000 Construction: $9,000,000 |
81.8 | 75 | 6.8 | 22 | 5 | 16 | 4 | 15 | 2.5 | 13 | 2 | 9 | 3.5 |
Quincy | 610823 | Quincy- Intersection Improvements at Willard Street and Ricciuti Drive | ICC | 75% Design | $1,812,839 | 41.1 | 36 | 5.1 | 16.5 | 6 | 11 | 5.25 | 4.5 | 0.75 | -1 | -2.25 | 5 | 3 |
100 | 80 | 20 | 25 | 18 | 14 | 12 | 11 |
Proponent | Project Number | Project Name | MAPC Subregion | Project Status | Project Cost | Total Score | Total Base Score | Total Scaled Equity Score | Safety | Safety Equity Score | Mobility and Reliability | Mobility and Reliability Equity Score | Access and Connectivity | Access and Connectivity Equity Score | Resilience | Resilience Equity Score | Clean Air and Healthy Communities | Clean Air and Healthy Communities Equity Score |
CATA | N/A | CATA- Fare Upgrades for ADA and Dial-A-Ride Customers | NSTF | N/A | $65,000 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
CATA | N/A | CATA- CATA Gloucester Facility Modernization | NSTF | N/A | $1,293,000 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
CATA | N/A | CATA - Vehicle Replacement (4 Vehicles) | NSTF | N/A | $2,460,000 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
MWRTA | N/A | MWRTA- Procurement of Three 29 Foot Buses | MWRC | N/A | $1,980,000 | 52.2 | 47 | 5.2 | 9 | 2 | 14 | 4 | 12 | 4 | 6 | 0.5 | 6 | 2.5 |
MWRTA | N/A | MWRTA- Blandin Hub Equitable Redesign Initiative | MWRC | N/A | $2,500,000 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
100 | 79 | 21 | 16 | 16 | 16 | 16 | 15 |
Proponent | Project Name | MAPC Subregion | Project Cost | Cost/Point | Total Score | Connectivity | Regional and Interlocal Coordination | Plan Implementation | Transportation Equity | Climate Change Mitigation | Performance Management | |
Arlington | Arlington- Installation of 123 Bicycle Racks and Related Materials | ICC | $90,878 | $1,220 | 74.5 | 15 | 9 | 18 | 9.5 | 13 | 10 | |
Boston | Boston- Bluebikes State-of-Good Repair, Twelve Stations | ICC | $590,348 | $7,717 | 76.5 | 18 | 8 | 14 | 12.5 | 14 | 10 | |
Boston | Boston- Installation of 1600 Bicycle Racks | ICC | $379,470 | $4,628 | 82 | 18 | 8 | 18 | 11 | 17 | 10 | |
Brookline | Brookline- Bluebikes State-of-Good Repair, Three Stations and 62 Pedal Bicycles | ICC | $200,000 | $2,985 | 67 | 16 | 8 | 6 | 7 | 13 | 9 | |
Cambridge | Cambridge- Bluebikes State-of-Good Repair, Eight Stations and 65 Pedal Bicycles | ICC | $385,456 | $5,627 | 68.5 | 17 | 8 | 12 | 8.5 | 14 | 9 | |
Chelsea, Revere | Chelsea-Revere- Regional On-Demand Microtransit Pilot Project | ICC | $499,649 | $9,296 | 53.75 | 13 | 11 | N/A | 11.25 | 11.5 | 7 | |
Malden | Malden- Canal Street Bicycle Lanes | ICC | $81,250 | $1,585 | 51.25 | 9 | 7 | 12 | 8.25 | 8 | 7 | |
Revere | Revere- Bluebikes Expansion, Four Stations and 40 Pedal Bicycles | ICC | $169,000 | $2,661 | 63.5 | 17 | 6 | 10 | 7.5 | 14 | 9 | |
Scituate | Scituate- Installation of 25 Bicycle Racks | SSC | $22,800 | $501 | 45.5 | 9 | 8 | 16 | 4.5 | 2 | 6 | |
Somerville | Somerville- Bluebikes State-of-Good Repair, Thirteen Stations | ICC | $278,127 | $4,120 | 67.5 | 14 | 8 | 16 | 7.5 | 13 | 9 | |
Abbreviations
ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. PRC = MassDOT's Project Review Committee.
Metropolitan Area Planning Council (MAPC) Subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.