Project No |
Name |
Value |
Year |
Note |
611974 |
MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN ST/SOUTH ST, MAIN ST/MYSTIC VALLEY PKWY RAMPS, AND MAIN ST/MYSTIC AVE |
$8,498,000 |
2026 |
High priority safety mitigation at state-owned Main/South intersection (Top 200); the project has been developed in close partnership with City and expanded to include Main/Mystic (locally-owned) to provide comprehensive safety and multimodal network improvements. |
609531 |
ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) |
1,625250 |
2025 |
Provide fully accessible safe walking route with safe roadway crossings for pedestrians and children walking to Stratton Elementary School in Arlington on Hemlock Street between Pine Street and Dickson Avenue; and Dickson Avenue between Hemlock Street and Pheasant Avenue. Install new sidewalk on the east side of Hemlock Street between Lansdowne Road and Yerxa Road. Install new sidewalk on the southwest/northwest sides of the Hemlock Street and Dickson Avenue intersection and on the northwest side of Dickson Avenue to Pheasant Avenue. Install new or upgrade curb ramps within project limits. |
611982 |
MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS |
$4,385,416 |
2025 |
The scope of the proposed project is to construct a multiuse boardwalk under the crossing of the Mystic River by State Route 28. The bridge is owned by MassDOT and the boardwalk will connect to land owned by MassDOT and DCR. This project closes gaps in the area's multimodal network by connecting to shared paths on either side. |